Toddle · 2025
Ignoring NPS scores to improve assignment experience
Assignments are the main feature in the plans Toddle sells and its most used module, so they account for 80% of our revenue. Their NPS was -3. As product manager and designer, I decided who to build for, what to fix first and what to leave out, then shipped the fixes in small releases to teachers who’d told us the product changed too fast.
Product manager & designer
3 designers, 10 engineers
May – Sep 2025
Teachers and admins
8 minute read

−3 → 10
NPS for assignments, from before the update to after it
30%
more assignments created after launch
90%
less development time to customise a template
The problem
Our biggest source of revenue had a negative NPS
Assignments are where teachers create and grade work and students hand it in. It’s the main feature in the plans we sell and the most used module on Toddle, which is why it accounts for 80% of our revenue. The NPS came back at -3.
Changing it was its own risk. So many teachers use assignments every day that any change lands on a lot of people at once, and they’d told us more than once that the platform changes too fast, with every update meaning more training. And one form had to work for IB PYP, MYP and DP, US and Australian curricula, and schools running their own.
Revenue
around 80% of it came from assignments, the main feature in the plans we sell
Sentiment
an NPS of -3, with more detractors than promoters
Engineering time
schools needed our tech team to set up how they ran assignments
The brief
How might we raise our NPS by fixing what’s already there, for the people closest to recommending us?
That meant saying no to two things people expected: going after our angriest users, and building new features.
Goals, measures and limits
Goal
Move people who scored 6 to 8 into the top group, and the ones just below the top to a 10
How we measured it
NPS, the number of assignments created, and development time for school setups
Out of scope
Detractors, new features, a big-bang release, and custom sections in templates, which we moved to a later version
Limit
Nothing breaks in grading, reports, portfolios or student data
My role
What I worked on
I owned assignments as product manager and designer, with three designers and ten engineers, from May to September 2025. Most of my time went on what to build and in what order. Once the direction was set, I handed design problems that were too big for one person to other designers.
Product
Survey design and analysis, prioritisation, the roadmap, getting engineering and leadership aligned, release planning, and launch with the product communications team
Design
Templates, the homepage widget, and the direction for assign settings and rubrics. Sai Charan worked on assign settings with me, and Priyansh Singhara took rubrics to final designs
Research
Who to build for, and what first
I designed the survey to show where the value was as well as how people felt. After the NPS question, two follow-ups in the style of the Sean Ellis test asked how people would feel if assignments were taken away, and what would most improve them. We sorted every answer by theme and score, and interviewed people where answers weren’t clear.

Green, yellow and red are score groups. I’ve blurred respondents’ names and emails.
Choosing the segment
The obvious move with a score of -3 was to win over the people who scored us lowest. I made the case against it. Winning them back is expensive, uncertain and slow, while people who already see value are one good experience away from recommending us, and moving them moves the score fastest.
0 to 5
We didn’t design for them
6 to 8
Move them into the top group
Just below the top
Move them to a 10
The prioritisation rule
Every theme went through the same three questions. Agreeing the rule first meant engineering and product leadership were aligned before anyone opened Figma, and later debates were about the data instead of opinions.
Question
Why it mattered
How many mid-to-positive responses does it have?
Those teachers were closest to recommending us, and the fastest to move
How many teachers hit it?
Frequency of the pain
How close is it to revenue?
Whether fixing it deepens adoption, reduces churn or unlocks new value
Competitor analysis
A feature gap we chose not to close
I benchmarked Toddle against Canvas, Microsoft Teams, Schoology, Google Classroom and SchoolBox, feature by feature. On paper, Toddle had the fewest of the six.
Features each tool had, from our comparison table
Canvas LMS
42
Microsoft Teams
36
Schoology
31
Google Classroom
29
SchoolBox
26
Toddle
23

The comparison table behind the chart, feature by feature.
The survey pointed the other way. Most of the feedback wasn’t about what Toddle couldn’t do. It was about what Toddle did poorly. So I took new features off the roadmap and kept one gap the table flagged: submission dates, which every tool handled differently and our users asked about too.
The solution
Starting with how an assignment gets made
We started with creating assignments. Schools form habits fast, and one big release would have overwhelmed users who needed training, processes and time to adapt to quick changes.
1
Templates
Schools shape the form
2
Assign settings
In the form, with more control
3
Rubrics
One setup for every type
4
Homepage
Submissions at a glance
Step 1 · Templates
Let schools set up the form themselves
Signal
“There are too many clicks to create an assignment.” Admins asked to control the fields their teachers saw, and teachers asked for something better than a blank slate.
Decision
Templates that a school group or a single school can set up: which fields show, which are required, what order the sections come in, and default assign settings. The creation form was regrouped into cards so related fields sit together.
Why
One change answered three requests, and schools no longer needed our tech team to set up their structure.
Result
Development time for template customisation dropped by 90%, from days to hours.
After · The template editor

The current structure could not directly translate into a template
Saving the existing form as a template would have broken almost straight away. The IB defines what formative and summative assessments are, so IB schools needed premade templates built around those definitions, while US, Australian and independent schools needed ones that assumed none of it. And every template still had to work with grading, the help articles and the AI.
Who gets to change what
On Toddle, an account is a school group or a district, with schools under it. Templates can be made at either level. A template made by the account is pushed to every school automatically. A school can’t pass it on or change its structure, only archive it for itself, and it can still make templates of its own.
Then came the question of what could change inside a template, and we mapped every field in a compatibility matrix. Toddle’s own templates can’t be renamed, because the AI and the help articles refer to fields by name. Once a school duplicates one or makes its own, it can show or hide fields, make them required and reorder them, and a few, like learning intentions and the description, can be renamed. Toddle still keeps the original system title, subtitle and placeholder underneath, so the AI knows what the field is when it helps write a learning experience. Subject and levels are always shown and always required, and grading configuration can’t be changed at all, because help articles refer to those settings by name, and if every school renamed them, nobody would know what an article meant.
In the template editor, an admin can pin up to three assessment tools so they show up front, hide a field, mark it as required, and open a field’s panel to give it the school’s own name while Toddle’s system name stays underneath.
Pin, and hide a field

Mark as required

Rename a field

Field
Show or hide
Required
Rename
Reorder
Pin
Title section
Unit
Yes
Yes
No
Yes
No
Subject
Always
Always
No
Yes
No
Duration (MYP only)
Yes
Yes
No
Yes
No
Pedagogical approaches (DP only)
Yes
Yes
No
Yes
No
Levels (if set up)
Always
Always
No
Yes
No
Banner
Yes
Yes
No
No
No
Details and resources
Learning intentions
Yes
Yes
Yes
Yes
No
Description
Yes
Yes
Yes
Yes
No
Resources, and each source: device, Google Drive, OneDrive, link, note
Yes
Yes
No
Yes
No
Submission template, and each option: workbook, Google Doc, Google Slides, uploads
Yes
Yes
No
Yes
No
LTI tools: Edpuzzle, Quizizz
Yes
Yes
No
Yes
No
Later versions: new sections, rich text fields and dataset fields.
From the implementation plan: what a school can change in a template it duplicates or creates. Rows with the same rules are grouped.
Step 2 · Assign settings
Bring assign settings into the form, with real control over dates
Signal
“I want flexibility to set visibility for students.” Our competitor table flagged submission dates as the one gap worth closing.
Decision
Move assign settings from a modal at the end into the form, one click fewer, and add open dates, close dates and visibility.
Trade-off
A longer form. The most used fields can be pinned to the top, date and time share one input, and a sentence spells out when submissions open and close.
Owner
Sai Charan, a senior product designer, worked on this with me.
After · Assign settings, now the last card of the create assignment screen

After · Turning on open and close dates, and setting visibility
Step 3 · Rubrics
Make rubric type a setting, so one rubric can do more
Signal
“Rubrics are rigid… what if I want to assess some standards and not assess the others?” Rubrics were one of the most-used assessment tools, and one of the most frustrating.
Decision
One creation flow and one template library for every rubric type, with type as a setting inside the rubric. Scoring became a layer on top, and a display settings panel controls what teachers and students see.
Why
Teachers needed a score for the gradebook and a grade for the report card from the same rubric.
Owner
I set the direction and handed it to Priyansh Singhara, who worked through the edge cases to the final designs.
Before · Teachers picked a rubric type from its own menu entry before building it, and couldn’t change it later

After · Configuring a rubric while creating an assignment

In use · Setting a rubric’s type, structure and display, then rating with it
Step 4 · Homepage
Put submission status on the homepage
Signal
“It is increasingly hard for me to find out what is ready to grade, and how many students have submitted.” Checking meant going into a class, then assignments, then the assignment.
Decision
An Assignments widget on the homepage. To-review is the default and shows how many students were assigned, turned in, were evaluated and had work shared back. Unread shows new activity, and Scheduled shows what’s coming up.
Why
Teachers decide when to grade based on what’s ready, so that belongs on the first screen they see.
After

Impact
What happened
The score went from negative to positive, teachers created more assignments, and school setups stopped costing engineering days.
−3 → 10
NPS for assignments, from before the update to after it
30%
more assignments created after launch
90%
less development time to customise a template
Risks I planned for
Risk
What we did about it
Teachers push back on yet another change
An opt-in rollout, a coachmark tour, and articles, walkthroughs and videos with the product communications team and school intermediaries
A bad release breaks grading, reports or student data
One change per release, heavy testing before it, and a testing cycle after
Renamed fields confuse the AI and the help articles
Toddle’s own templates can’t be renamed, renamed fields keep their system name, and grading configuration is locked
One template can’t serve every curriculum
Premade IB templates, plus templates at account and school level
Updating a template strands old assignments
Old assignments get ported, and admins see how many before they confirm. The first version only updates layout and configuration
Bringing teachers along
Because teachers were wary of change, the new form was opt-in to start with, and the first time someone opened it, a short tour showed what had moved. The first step said it plainly: everything is still where you’d expect it.
Intro

Step 1 of 2

Step 2 of 2

What came next
Assignment creation
→
Grading
→
Gradebook
→
Navigation
Feedback from school buddies and support channels went straight into choosing the next theme. Grading, the gradebook and navigation followed the same way.
Looking back
What I took from it
Data is only as useful as the questions you ask before you collect it. The survey told us what to fix, who to fix it for, and in what order.
Saying no was most of the strategy. Leaving out detractors and new features felt uncomfortable, and it gave us a tighter scope, faster wins and movement we could measure.
A high-revenue module sets the pace. With 80% of revenue on the line, small releases and heavy testing were how we kept moving without breaking grading, reports or student data.
A mastery based grading system
Toddle · Product designer & lead · 2024–25
Took Toddle from grading by score to grading skill by skill, from the first school interviews to the pilot.
Enter password to read-3 → 10